Green Cycle Project

Location Beerfelde – Juni 2022

Green Cycle Project

Location Beerfelde – Juni 2022

Green Cycle Project

Location Beerfelde – Juni 2022

Green Cycle Project

Location Beerfelde – Juni 2022

Separation Prototype

Conveying of pre-separated fermentation residues

Separation Prototype

Separation of the liquid components from the solids

Separation Prototype

Intermittent promotion of the fugate into the storage container

Dosing Unit

Dosing of the Fugate from the storage tank to the irrigation water depending on the nutrient requirements of the plants

Dosing Unit

Dosing of the Fugate from the storage tank to the irrigation water depending on the nutrient requirements of the plants

Dosing Unit

Dosing of the Fugate from the storage tank to the irrigation water depending on the nutrient requirements of the plants

Separation of the Organic

Conveying of pre-separated fermentation residues

Green Cycle Project

Nozzle Test

Green Cycle Project

Nozzle Test

Foam Test

Before adding vegetable oil

 

In Numbers

 

4500m³ digestate separated since last winter.

Increase of the fugate throughput per hour from 5m³ to 6m³

Power consumption 1.5kW /m³ Fugat

3700m³ added in a ratio of 1:10 to 1:30

0.45€/m³ energy costs with 0.30€/kWh +
2€/m³ Annual depreciation +
€0.10/m³ other costs +
-> €2.55/m³ running costs including depreciation

In comparison:
Conventional application costs of digestate 4€/m³

Module Design

Draft of a possible module for digestate separation.

Module Design

Draft of a possible module for digestate separation.